Faster, Cost-Effective Construction

ogin wind turbine technology construction

The Ogin Turbine is designed with easy, fast construction in mind.  Turbines are shipped in what is essentially a mobile factory.  Components can be assembled quickly with much smaller, less expensive cranes than traditional turbines.  Following site preparation, individual turbines can be erected in a matter of days instead of weeks.

Site preparation itself is easier because there is no need to widen existing roads.  Turbines are shipped in standard 40-foot containers and can be brought in on standard roads.  Ogin Turbines are also suitable for small to mid-size projects that can connect to existing grid infrastructure.  This approach eliminates the time and cost of building high-voltage substations or long-distance transmission lines.  The bottom line:  faster, more cost-effective construction of clean wind energy projects.